facebook youtube whatapps
INTERMEDIATE UNIT      
STRUCTURE Reinforced Concrete    
WALL Reinforced Concrete    
ROOFING COVERING Reinforced Concrete Slab / Metal Deck Roofing Sheet    
ROOF FRAMING Lightweight Steel Trusses    
CEILING Plaster Ceiling / Skim Coat    
WINDOWS Aluminium Frame Glass Panel    
DOORS Main Entrance Door Timber Flush Door  
  Others Timber Flush Door  
IRONMONGERY Main Entrance Door Lever Handle Lockset  
  Bedrooms, Laundry & Utility Lever Handle Lockset  
  Bathrooms Lever Handle Lockset (Privacy)  
WALL FINISHES Bathrooms Tiles to Ceiling Level  
  Kitchen (Behind Sink) Tiles to 1.7m Height / Emulsion Paint  
  Others Emulsion Paint  
FLOOR FINISHES Living & Dining Tile  
  Kitchen Tile  
  Laundry Tile  
  Bedrooms Tile  
  Bathrooms Tile  
  Utility Tile  
  Family Tile  
  Staircase Tile  
  Car Porch Tile  
  A/C Ledge Concrete Finish / Cement Render  
  Concrete Roof Concrete Finish  
SANITARY & PLUMBING FITTINGS Wash Basin 4 Unit  
  Water Closet 4 Unit  
  Shower Head 4 Unit  
  Kitchen Sink 2 Unit  
ELECTRICAL INSTALLATIONS Lighting Point 25 Point  
  Power Point (13 AMP) 17 Point  
  Ceiling Fan Point 7 Points  
  Water Heater Power Point 4 Points  
  Air Cond. Power Point 6 Points  
  Swing Auto. Gate Point 1 Point  
  Door Bell Point 1 Point  
  Astro Point 2 Point  
INTERNAL TELECOMMUNICATION
TRUNKING AND CABLING
Fibre Optics Cabling c/w Fibre Wall
Socket and Fire Termination Box
1 Point  
FENCING Front ≈ 1.5m Height Fencing Wall c/w Mild Steel Gate  

Note: The Developer shall, at its own cost and expense, install or construct all of the items listed above in accordance with the description set out save for the item or items marked with an * which may be deleted if not applicable.

Bayu Sutera (Precinct 4a-1) • No. Lesen Pemaju : 10613/11-2023/0024(A) • Tempoh Sah : 19/11/2021 ~ 18/11/2023 • No. Permit Iklan : 10613-53/09-2024/0197(N)-(L) • Tempoh Sah : 27/9/2022 - 26/9/2024 • Hakmilik Tanah : Kekal • Bebanan Tanah : Tiada • Pelan Bangunan Diluluskan oleh : Majlis Perbandaran Port Dickson • No. Rujukan : MPPD.431/31/2021/01(15) • Tarikh Dijangka Siap : August 2024 • RTDT (Elonia) – 227 Unit, RM 734,888 (Min) - RM 1,111,208 (Max) • Sekatan-Sekatan Kepentingan : Tanah yang diberimilik ini tidak boleh dipindahmilik, dipajak, digadai melainkan dengan kebenaran bertulis daripada Pihak Berkuasa Negeri. • All renderings contained in this advertisement are artist’s impressions only. The information contained herein is subject to change without notification as may be required by the relevant authorities or developer’s project consultant. Whilst every care is taken in providing this information, the owner, developer and manager cannot be held responsible for any variations. This is not a gated and guarded development. For avoidance of doubt on the specifications and development status, please always refer to the Sale and Purchase Agreement.

Bayu Sutera (Precinct 4a-2) • No. Lesen Pemaju : 10613/11-2023/0024(A) • Tempoh Sah : 19/11/2021 – 18/11/2023 • No. Permit Iklan : 10613-55/11-2024/0375(N)-(L) • Tempoh Sah : 30/11/2022 – 29/11/2024 • Hakmilik Tanah : Kekal • Bebanan Tanah : Tiada • Pelan Bangunan Diluluskan oleh : Majlis Perbandaran Port Dickson • No. Rujukan : MPPD.431/30/2021/01 • Tarikh Dijangka Siap : November 2024 • RTDT (Elonia II) - 70 Unit, RM 734,888 (Min) - RM 1,395,788 (Max) • Sekatan-Sekatan Kepentingan : Tanah yang diberimilik ini tidak boleh dipindahmilik, dipajak, digadai melainkan dengan kebenaran bertulis daripada Pihak Berkuasa Negeri. • All renderings contained in this advertisement are artist’s impressions only. The information contained herein is subject to change without notification as may be required by the relevant authorities or developer’s project consultant. Whilst every care is taken in providing this information, the owner, developer and manager cannot be held responsible for any variations. This is not a gated and guarded development. For avoidance of doubt on the specifications and development status, please always refer to the Sale and Purchase Agreement.

Bayu Sutera (Precinct 4a-3) • Developer’s License No : 10613/11-2028/1282(A) • Validity Period : 19/11/2023 – 18/11/2028 • Advertisement Permit No. : 10613-56/03-2026/0322(R)-(L) • Validity Period : 16/03/2025 – 15/03/2026 • Land Tenure : Freehold • Encumbrance: None • Building Plan Approved By : Majlis Perbandaran Port Dickson • Reference No. : MPPD.431/30/2021/01(21) • Expected Completion Date : March 2026 • RTDT (Elonia III) - 128 Unit, Baki Unit 66, RM 697,888 (Min) - RM 1,052,763 (Max) • Restriction of Interest: The land ownership granted is not transferable, leasable, or mortgageable without prior written consent from the State Authority. • All renderings contained in this advertisement are artist’s impressions only. The information contained herein is subject to change without notification as may be required by the relevant authorities or developer’s project consultant. Whilst every care is taken in providing this information, the owner, developer and manager cannot be held responsible for any variations. This is not a gated and guarded development. For avoidance of doubt on the specifications and development status, please always refer to the Sale and Purchase Agreement.

THIS ADVERTISEMENT HAS BEEN APPROVED BY THE NATIONAL HOUSING DEPARTMENT.

Top